Projects

Cosmos Green Investments is mainly involved in projects:

Final Objective:

Upgrade, Management & Economy

The ultimate goal of all the above is the proper energy management through a combination of sources, consumption control, and “smart” operation of lighting, devices, air conditioning, cooling, and other systems, as well as the optimization of energy usage time for each source. This ensures the full utilization of all technological achievements and the advantages of each specific installation.

Several of our most important projects:

Motor Oil Group

Upgrade of MOTOROIL-KONKAT Central Buildings
Replacement of 2.2MW chillers with new high-efficiency DAIKIN heat pumps. Achieved energy consumption savings of 50%.

Location: Irodou Attikou, Marousi

Metro Cash & Carry and My Market

Study, supply & installation of solar panel systems under Net Metering status in 97 separate facilities of the Metro Cash & Carry and My Market supermarket chains, with a total capacity of 25MW.

Location: Throughout Greece

Zero Energy Footprint in a Residential Property

Study, sizing, and implementation of renewable energy systems for a zero-energy footprint in a residential property.

Location: Varibobi, Attiki

Installation of a high-efficiency heat pump, Vaillant solar thermal system, Rehau underfloor heating, cooling, ventilation, air conditioning, and a solar panel system under net metering with energy storage.

Residence with Solar panel Systems

Installation of a high-efficiency heat pump, Vaillant solar thermal system, Rehau underfloor heating, cooling, ventilation, air conditioning, and a photovoltaic system under net metering with energy storage.

Location: Kouvaras & Karellas, Attiki

Paros Agricultural Cooperative

Study, supply, and installation of solar panel systems under net metering for the Paros Agricultural Cooperative with a capacity of 100kW.

Location: Agios Georgios, Paros

Supermarket Best Value

Study, supply, and installation of solar panel systems under net billing for the Best Value supermarket chain with a capacity of 400kW.

Location: Limassol, Cyprus

Net Billing in Oinofyta

Study, supply, and installation of solar panel systems under net metering for a product distribution center in Oinofyta with a capacity of 1.6MW.

Location: Oinofyta, Attiki

Golden Door

Study, supply, and installation of a solar panel system under net billing for the Golden Door security door manufacturing industry with a capacity of 250kW.

Location: Aspropyrgos, Attiki

2nd Kindergarten of Mandra, Attiki

Installation of a NIBE geothermal heating and cooling system with a capacity of 120kW.

Location: Mandra, Attiki

Lianos S.A.

Study, supply, and installation of a solar panel system under net billing for the Lianos S.A. steel reinforcement trading industry with a capacity of 135kW.

Location: Metamorfosi, Attiki

Designing Solutions
based on different needs

Custom approach to each project

in businesses where energy constitutes a foundational element of success and an engine for progress.